Log in Register

Carpenter / Joiner

Timber Frame Construction

Design and erection of timber frame structures for extensions, annexes, and new builds. Covers sole plate installation, stud wall frames, and structural panel systems.

Typical cost
£2,400 — £4,800
Typical duration
1-2 weeks
Scope type
flexible

Typical tasks

Extras & additional works

Based on a standard 50m² timber frame construction. Costs may increase if access is difficult or if premium materials are chosen.

Common questions  Stainesai
The price can be affected by the size of the structure, type of materials used, and ease of access to the site.
A typical timber frame construction for a standard-sized residential project takes about 1-2 weeks.
Yes, carpenters usually supply the materials needed for timber frame construction unless specified otherwise.
No, timber frame construction is not a regulated trade in the UK. Always confirm with your tradesperson before work begins.

Ready to post a timber frame construction job?